Dunham provided mechanical and electrical engineering (EE through SD only) services for a 20,000 SF addition to an existing facility that includes an 8,000 SF Dry (0.5%RH @ 70°F) and Clean (ISO-7) space, and N+1 redundant cooling/heating plant. The project included the renovation of existing building spaces for a gowning room and product test room. The Dry Room utilizes active desiccant dryer ducted to ceiling-mounted HEPA filters to maintain the Dry Room environment. The design includes bottled and bulk process gas distribution from source to tools, central solvent, titanium, and dust exhaust, and process cooling water systems.

icon
24/7
N+1 Redundancy
icon
High-Tech
Dry Room Manufacturing Laboratory